Lots are back to back with entrance from 2 streets. Lots have been cleared and have black rock drive ways. The metal building was built in 2012 and has 2,400 sq ft with 2 overhead doors & front and back entrance doors. The plumbing has been stubbed out of the slab and ready to be plumbed. This section of the Sub-Div is Mobil home acceptable but may also be used for business purposes. Bring your plans and get started at the lake. Springhill Sub-Div homes only restrictions do not apply.